Begin Historic Property Project Documentation (HPPD) Completion. 1.1 Prepare Contextual Analysis (Not Required for Designated Historic Structures and Cultural Landscapes) Document existing Building Character and Site Character using the Contextual Analysis template. Template: Contextual Analysis Using the PMIS Project Statement (Project Management Information System), Project Data Sheet (PDS), Program Requirements, and Facility Planning Model (if applicable) as the basis for programming, prepare the Project Program. The Project Program includes a Site Analysis, a Site Program, and an Architectural Program. 1.3 Prepare Integrated Design Narrative Working collaboratively within the integrated design team, complete the Integrated Design Narrative documenting the integrated design process used during the Predesign phase. Template: Integrated Design Narrative 1.4 Complete Contextual Analysis Template (when required) Document proposed Building Character and Site Character using the Contextual Analysis template. Template: Contextual Analysis This section is being developed. 1.6 Prepare Class C Uniformat Construction Cost Estimate Based on the Project Program requirements prepared above, prepare an independent Class C Uniformat Construction Cost Estimate using the Class C Uniformat Construction Cost Estimate template. Template: Class C Uniformat Construction Cost Estimate November 2023 - for projects starting 11-15-23 and after Guidance: Cost Estimating Requirements Handbook November 2023 - for projects starting 11-15-23 and after 1.7 DB Predesign (PD) Deliverables 1.7.1 Submit 100% Draft DB Predesign Documents (PD) for Review
1.7.2 Submit Final DB Predesign (PD) Documents Resolve 100% Draft DB PD Documents review comments and incorporate resolutions into Final DB PD Documents. Submit Final DB PD Documents and responses to review comments, utilizing the NPS DSC Quality Assurance (QA) Review Comments form, within 15 calendar days after receiving comments. |
Last updated: March 28, 2025